Skip to content

Case Study – Deep Sea Anchors AS

Some case-study-projects have been done in Trondheimsgfjord, Troll and Gjøa, and the references this projects have given proves the effect and stability our technology can offer.

Project  year  Project Description 
 Small Prototype Test 2003      Test using prototype, i.e. 2.8 tonnes DPA
 DPA test in Troll 2008  Test for Technology Qualification Plan (TQP)
 DPA Installation – Gjøa Field        2009  Installation of full size DPA